Thermal Engineering
Cellar Air Conditioning
Challenge:
In this process, our client was the final customer, the owner of a winery, who provided us with a HVAC project complete to ventilate and acclimatize the area of human occupation and wine aging;
Through the project that came to us, we proposed small changes in order to:
correct some concrete gaps in the project;
reduce the cost of the initial investment, without compromising the quality and efficiency of the installation (operating costs);
the installation included:
- some close-control units for temperature and humidity control in the training areas, associated with a chiller as cold source;
- VRV sets for offices and event rooms;